Comparison
Linetrack vs.
detailed scheduling system

In short
A detailed scheduling system and Linetrack work from the same basis: the hours from the ERP. The detailed scheduling system spreads them in detail across machines, workstations and staff of one department, typically production, for the next days and weeks. Linetrack spreads them across projects and departments over the entire project duration: with tasks, dependencies between departments, a critical path and a capacity histogram across all projects. In series production, the detailed scheduling system is the right tool. For long-running projects that pass through many departments, you need the project view, and the department heads plan their share in it themselves.
400+
Excel lists and planning tools
replaced
39 %
of customers with a live interface
have connected their ERP
1512+
industrial projects
managed in parallel
10 days
median to the first
self-planned project
*Every figure on this page comes from a full survey of all live Linetrack implementations, as of August 2026.
Starting point
What detailed scheduling systems were built for
Detailed scheduling and shop-floor control systems, often grouped under the term APS, schedule production. Orders, operations and standard times come from the ERP. The system spreads them across machines, workstations and staff and, depending on the system, takes shifts, qualifications and sequences into account. In series and variant production this is an established tool.
The basic idea is the same as in Linetrack: hours from the ERP are broken down onto real capacity. The difference is the planning object. The detailed scheduling system plans operations within one department; Linetrack plans tasks in projects that pass through several departments. How the other system categories fit in is covered in the software comparison.
Planning levels
Where the detailed scheduling system sits in planning
Industrial projects are planned on three levels: project planning with a resource forecast, detailed and staff scheduling in the departments, and task tracking by staff. The detailed scheduling system works on the middle level. There it loads the machines, workstations and staff of one department, usually production, and does so very precisely.
Upwards it lacks the project plan: production only notices that design is three weeks behind when the order arrives late. Departments without a detailed scheduling system plan their staff in Excel sheets anyway. Linetrack connects the three levels: the project manager's forecast becomes department planning, staff scheduling becomes the task, feedback becomes the actual status. A production scheduling system can remain alongside. The Resources and capacity page describes how Linetrack plans departments and staff.
Breaking point
Where detailed scheduling reaches its limit
The limit is not computing power. It is the point where production orders turn into long-running projects that pass through many departments one after another.
None of this is a flaw in detailed scheduling. It is built for production. For complex, long-running projects, though, it quickly becomes an administrative burden. How Linetrack plans the capacity of departments and staff is described on the resources and capacity page.
Side by side
Detailed scheduling system
versus Linetrack
Seven points where the difference in scope shows up day to day. This is not about feature lists but about what each system is built for.
In one respect detailed scheduling is ahead: detailed loading of machines and workstations at operation level. Linetrack does not claim that. The other rows are a question of scope, production versus project. The wider frame is described on the multi-project management page.
Security & Trust
Your data. Secure in Germany.
Linetrack runs entirely within the EU – hosted with an ISO-certified partner, fully encrypted, and backed up regularly.
Made in the EU
GDPR-compliant
Hosted in Germany
Application, database, and backups run exclusively with Hetzner in the Falkenstein data center.
Fully GDPR-compliant
Your data is processed and stored exclusively within the EU.
ISO/IEC 27001:2022-certified data center
Our hosting partner operates the data center to the internationally recognized ISO/IEC 27001 security standard.
Encrypted in transit and at rest
Data transmission via TLS 1.2/1.3, storage secured with AES-256 encryption.
Multi-tier backups
Hourly, daily, and monthly backups with a typical recovery time of under one hour.
Honest boundaries
When a detailed scheduling system remains the right choice
In these four cases Linetrack adds nothing over detailed scheduling:

The case where Linetrack makes the difference: long-running projects that pass through engineering, purchasing, production and assembly one after another while sharing staff. How the hour budgets from the ERP are taken over for that is shown in the comparison with the ERP project module.
Working together
How Linetrack works alongside detailed scheduling
Linetrack uses the same basis as detailed scheduling: orders, project numbers, cost centres and master data from the ERP, plus the hour budgets. Actual hours and absences from time tracking flow into capacity planning, so the calculation uses the time that is actually available.
Department heads plan their share down to individual staff; employees see their tasks and report back via web and mobile app. Which systems get connected is set out under interfaces and integrations.

The median time between kick-off and the first self-planned project is ten working days, regardless of company size. The process is described on the implementation page.
FAQ
Frequently asked questions
Still have questions?
Book a meeting with our team.
What is the difference between a detailed scheduling system and Linetrack?
What is the difference between a detailed scheduling system and Linetrack?
Does Linetrack replace a detailed scheduling system?
Does Linetrack replace a detailed scheduling system?
Can Linetrack plan down to individual employees?
Can Linetrack plan down to individual employees?
Why are detailed scheduling systems often too cumbersome for projects?
Why are detailed scheduling systems often too cumbersome for projects?
Does Linetrack reschedule automatically?
Does Linetrack reschedule automatically?
Where do the hours Linetrack plans with come from?
Where do the hours Linetrack plans with come from?
More comparisons
Learn more
Linetrack in detail
The modules behind capacity planning for departments and staff:




















