Process

How implementing Linetrack works

Linetrack is rolled out in stages. We start with project management and then bring in the departments one at a time, while your day-to-day work carries on without interruption. Getting there takes three phases: clarify, set up, establish. Every step has a defined result that has to be in place before the next one starts.
  • Staged rollout
  • Starts in project management
  • No disruption to daily work
Abstract illustration of a multi-stage project process.

In short

Implementing Linetrack runs in eleven steps across three phases: Clarify before the decision (initial consultation, follow-up consultation, testing, proposal), Set up through go-live (rollout concept, system setup, migration of existing plans, onboarding), and Establish after go-live (support and staged expansion, interface development, impact review). The rollout happens in stages: project management first, then the departments one after another, without interrupting ongoing work. It takes just ten working days from kick-off to go-live, after which the first training sessions start.

Rollout

Rolled out in stages, without downtime

Linetrack is not switched on for everyone on a single cut-over date. We start softly in project management, because that is where the schedules come together. The departments keep working as usual in the meantime.

The departments then join one after another, each with its own training and only once the previous stage is running smoothly. Your ongoing work is never interrupted.

Why no big bang? In Linetrack, project management and the departments work on the same plan. If everyone switches over on the same day, everyone is learning at once, and coordination between the areas breaks down exactly when it is needed most.

works in Linetrack works as before

  1. Stage 1

    Start in project management

    The ongoing projects are planned in Linetrack. Dates still reach the departments through the usual channels.

    • works in Linetrack: Project management
    • works as before: Engineering
    • works as before: Production
    • works as before: Purchasing
    • works as before: Assembly
    • works as before: Project team members
  2. Stage 2

    The first departments join

    The areas with the most coordination plan their capacity in the same system as project management.

    • works in Linetrack: Project management
    • works in Linetrack: Engineering
    • works in Linetrack: Production
    • works as before: Purchasing
    • works as before: Assembly
    • works as before: Project team members
  3. Stage 3

    All departments on one plan

    The remaining departments follow. An Excel list is only retired once its area is working reliably in the system.

    • works in Linetrack: Project management
    • works in Linetrack: Engineering
    • works in Linetrack: Production
    • works in Linetrack: Purchasing
    • works in Linetrack: Assembly
    • works as before: Project team members
  4. Stage 4

    Project team members in task management

    Finally, the project team members join. They see their tasks in task management and report progress directly in the system instead of by email or word of mouth.

    • works in Linetrack: Project management
    • works in Linetrack: Engineering
    • works in Linetrack: Production
    • works in Linetrack: Purchasing
    • works in Linetrack: Assembly
    • works in Linetrack: Project team members

Example sequence. Which department joins when is set together in the rollout concept.

The steps

Eleven steps across three phases

Phase A

Clarify — before the decision

  1. Initial consultation

    An introduction based on real situations rather than a feature list, together with an analysis of the existing setup: which lists, tools, and Excel files are in use today, who maintains them, and where schedules and capacity are running separately from one another.

    ResultHonest baseline assessment and a picture of the gaps

  2. Follow-up consultation

    The target state: project structure, the departments involved, roles, planning depth, and the modules you actually need.

    ResultAgreed target state, scope, and effort range

  3. Testing

    Before the decision you get Linetrack into your own hands, together with the future user group and against your own planning questions. Testing is free of charge and part of the initial engagement. The people who will work with it later have used the system beforehand.

    ResultDecision-makers and users know what they are committing to

  4. Proposal and decision

    Binding license scope and service packages, along with a schedule and named points of contact on both sides.

    ResultSignature and a project start with a clear framework

Phase B

Set up — through to go-live

  1. Rollout concept

    We align the implementation with your processes so that Linetrack becomes part of the existing workflows rather than another island next to them. That covers the ground rules of planning (how deep planning goes, who is allowed to move dates, which capacities are binding) and the order in which the departments join after project management.

    ResultAgreed stage plan and planning logic for the system to build on

  2. System setup

    Configuration of the environment according to the defined logic: project structures, departments, roles and permissions, calendars and capacities.

    ResultWorking environment that fits your processes

  3. Migration of existing plans

    Transfer of the ongoing projects from Excel and MS Project, a structural review, and adjustment to the agreed planning logic. The errors that become visible in the old plans along the way are part of the result.

    ResultReal project status in the system instead of re-entering everything

  4. Onboarding and go-live

    Go-live starts in project management: it plans the ongoing projects in the system while the departments keep working as before. Each group gets role-based training covering what it needs day to day, at the point when its turn comes in the stage plan.

    ResultProject management planning live in the system, with no work standing still

Phase C

Establish — after go-live

  1. Support and staged expansion

    A dedicated point of contact, short regular meetings, and adjustments during live operation. In this phase the departments join according to the stage plan, each one only once the previous one is working reliably in the system.

    ResultDepartment by department in the system, with no parallel planning in Excel

  2. Interface development

    Live connection to ERP systems, to time tracking (AIDA, Finkzeit, OptiTime), imports from MS Project, Primavera, Excel and SAP, as well as a REST API. This can run in parallel and is not a prerequisite for the start.

    ResultContinuous data foundation without duplicate entry

  3. Impact review

    After about three months, a comparison against the baseline from step 1: how many lists have been replaced? How has schedule adherence developed? Where is planning still happening on the side?

    ResultDocumented impact and a basis for the next expansion stage

Duration

How long this takes

How long clarifying takes depends on your calendars. Setting up is done after ten working days, and the departments then join step by step.

Phase A – Clarify
1–3 weeksDepends on how quickly meetings with everyone involved can be arranged.
Phase B – Set up
10 working daysFrom kick-off to go-live: set up the system, transfer the running plans, start the first training sessions.
Phase C – Establish
ongoingDepartments join according to the stage plan, impact review after around three months.

From kick-off to go-live: 10 WD

*From a full survey of all live Linetrack implementations, as of August 2026.

Costs

What this costs

You only pay for what you actually use. Every user gets a base license, and modules are added per user. Someone who only reports back on tasks does not need full planning access and costs correspondingly less. The license starts at EUR 10 per user per month.

Testing before the decision is free of charge. Rollout concept, system setup, onboarding and migration of existing plans are not included in the license fee; they are available individually and are priced according to scope. Interfaces that already exist are simply connected, with no new development needed – effort only arises where your data differs from what has been implemented so far. Which steps make sense emerges from the initial consultation.

License per user

  • Resource management
  • Multi-project management
  • Project planning
  • Base license

Project management

  • Resource management
  • Base license

Department head

  • Task management
  • Base license

Team members

Example configuration. Which modules each user needs is worked out in the follow-up consultation.

Effort

Who does what

The most common unspoken question ahead of an implementation is how much work stays in house. That is why it is broken down here for every step.
StepLinetrackYour team
Initial consultationRunning the conversation and analyzing the existing setupParticipation of project management and the department, overview of the lists in use
Follow-up consultationStructuring the target state, scope and effort rangeDecision on planning depth and the areas involved
TestingAccess, preparation and support, free of chargeParticipation of the future user group
Proposal and decisionProposal, schedule, points of contactSign-off and naming of a responsible person
Rollout conceptAlignment with your processes, stage plan for the departmentsInformation on how the processes actually run, decision on responsibilities and sequence
System setupFull configuration of the environmentDepartment structure, roles and capacity per area
Migration of existing plansImport, structural review, adjustmentProviding the ongoing plans from Excel and MS Project
Onboarding and go-liveRole-based training, start in project managementParticipation of project management, later the departments
Support and staged expansionDedicated point of contact, training per department, fine-tuningFeedback from operation, sign-off for the next stage
Interface developmentDevelopment and connectionIT contact for the integration
Impact reviewEvaluation against the baselineParticipation and assessment from the areas involved

Experience

What happens when steps are skipped

Not every step is necessary for every company. With these three, though, the consequences of skipping them are the clearest.

Without a rollout concept

If Linetrack is placed next to the existing workflows instead of into them, it becomes another island: one more tool to maintain while the real coordination still runs through Excel and word of mouth. Unresolved planning rules do not disappear either. If nobody has decided who is allowed to move dates, everyone decides that for themselves, only now it is documented.

Without testing

Anyone who has not used the system themselves before the decision keeps their own list going, just in case. The Excel file stays in parallel use, and so there are still two versions of the truth.

Without plan migration

A system holding sample data is a demo, not a working tool. As long as the ongoing projects are not in it, nobody is working on the real status – and the implementation quietly slips to the next project.

Context

Why this is not an ERP project

An ERP system is built for controlling and order processing, not for operational scheduling and capacity planning. Its project module therefore covers one slice, and detailed planning moves back into Excel anyway.

Implementing Linetrack starts alongside that, not inside it. Planning begins with the first migrated project list, and it does so without any interface having to be in place. The connection to ERP and time tracking comes afterwards and improves planning that is already running by that point.

So you do not have to choose between an ERP project and planning transparency. Linetrack does not replace an ERP system and is not meant to: it connects project planning, department planning, ERP and time tracking into one shared data foundation.

Project management dashboard with a Gantt chart, running alongside the ERP system

FAQ

Frequently asked questions about implementation

Still have questions about the process?

In the initial consultation we work out which steps make sense in your situation.

How long does implementing Linetrack take?

It takes ten working days to go-live. By then the system is set up, the existing plans have been transferred and the first training sessions begin. From that point project management creates its own projects, and a new project takes a few minutes to set up. How long the full rollout across all departments takes depends on the number of areas involved, the scope of the plan migration and on whether interfaces are developed.

Will our day-to-day work be interrupted during the implementation?

No. Linetrack goes live in project management first, while the departments keep working as before. They then join one after another, each with its own training. There is no cut-over date on which everyone switches at once.

Are consulting and onboarding included in the price?

Testing before the decision is free of charge. The license starts at EUR 10 per user per month; rollout concept, system setup, onboarding and plan migration are available separately and are calculated per project. Interfaces that already exist are simply connected, with no new development needed.

Do we have to go through all the steps?

No. The initial consultation, system setup and onboarding are the basis; everything else depends on the baseline and the target state. With clearly defined planning processes the rollout concept stays lean, and what remains at its core is the stage plan for the departments. Companies with many ongoing projects benefit considerably from plan migration.

Can existing project plans be carried over?

Yes. Plans from Excel and MS Project are imported, checked structurally and adapted to the agreed planning logic, so ongoing projects do not have to be entered again.

Do we need the interface to the ERP at the start?

No. Linetrack runs productively without an interface; the connection to ERP or time tracking can happen in parallel or later and is not a prerequisite for go-live.

How much effort does this create on our side?

We carry the largest share. On your side it takes one person responsible for questions of structure and roles, the provision of the existing plans, and the participation of users in testing and the training.

What happens if the initial consultation shows that Linetrack is not a fit?

Then we say so. Linetrack is built for plan-driven projects with many dependencies and not for pure task tracking without resource logic – generic tools are better suited to that.