Data takeover
SAP Integration
into Linetrack

In short
The SAP integration takes over master data and existing planning data from SAP during Linetrack's rollout - a one-off data takeover that is already built and runs with no separate development needed. Your existing SAP data does not have to be re-entered by hand for this - it is taken over straight into the Linetrack plan.
Data takeover
What Linetrack takes over from SAP
SAP is one of the systems Linetrack takes existing data over from directly during rollout.
The full list of every connected system is on the interfaces overview.
Challenge
Why SAP master data would otherwise be maintained twice
Master data and existing planning data sit in SAP. Without a takeover they would have to be re-entered by hand during rollout - with the risk that the two versions drift apart over time.
When SAP master data affects several projects at once, that shows up directly in the portfolio view within multi-project management.
As a widely used ERP system, SAP also falls under the general ERP integrationin many projects, whose live sync runs independently of the one-off data takeover.
The data takeover runs as part of the implementation, not as a separate project ahead of it.

FAQ
Frequently asked questions
Still have questions?
Book a meeting with our team.
What data does Linetrack take over from SAP?
What data does Linetrack take over from SAP?
Is the SAP connection a live sync or a one-off takeover?
Is the SAP connection a live sync or a one-off takeover?
Does the SAP data takeover require extra development?
Does the SAP data takeover require extra development?
Do I have to re-enter my SAP master data by hand before rollout?
Do I have to re-enter my SAP master data by hand before rollout?
Learn more
Linetrack in detail
The features that build on taken-over SAP master data:
