ERP integration

Infor ERP for the group, Linetrack for capacity per plant.

Infor LN is designed for make-to-order and project-based manufacturing, Infor CloudSuite Industrial (formerly SyteLine) for mid-sized manufacturers. Linetrack adds planning for design, assembly and commissioning per plant, each with its own template, calendar and portfolio. Through the REST API, projects and employees come from Infor ERP, and planned hours and KPIs per project, company and resource group go back.

Via the REST APIInfor LN and CloudSuite IndustrialCalendar and portfolio per plantKPIs for controlling

Infor ERP website ↗

In short

Infor ERP, meaning Infor LN or Infor CloudSuite Industrial (SyteLine), is connected through the Linetrack REST API. The calls run through Infor's integration layer such as Infor ION, your Infor partner or middleware such as Power Automate, Make or n8n; there is no dedicated Infor connector. Sales order lines or projects in Infor become Linetrack projects with order and item number, each plant with its own template, calendar and portfolio. Planned hours per task and resource and KPIs per project, per company and per resource group and month go back.

Building blocks

One ERP for the group, one plan for every plant

When design sits in one plant and assembly in another, planning has to know both. These six building blocks connect Infor ERP and Linetrack, and we decide together which of them you use.

To LinetrackOrder

A sales order line becomes a project

In Infor LN a project can be generated from a sales order line. Linetrack takes over the numbers: order and line number, the project number as external ID, plus customer and project manager. The plan comes from the template of the plant that handles the order.

  • Order number
  • Line number
  • Project number
  • Customer
  • Project manager
  • Template
  • External ID

Where in Linetrack: project overview

To LinetrackSite

Calendar and portfolio per plant

When creating the project, the interface passes its portfolio and calendar. An order for the plant in Saxony uses Saxon public holidays, one for the plant in Bavaria the Bavarian ones, and every project manager finds their projects in the portfolio of their site.

  • Portfolio
  • Calendar
  • Public holidays
  • Project manager
To LinetrackStaff

Employees at every site

Employees arrive by personnel number from Infor or the group's HR system, absences with their type or, privacy-compliant, as a period only. Every resource group then plans with the people who are actually there.

  • Personnel number
  • Resource group
  • Holiday
  • Assembly
  • Absence without reason

Where in Linetrack: resource view

To LinetrackPartners

Suppliers and sister plants

Suppliers from Infor arrive with supplier number and contacts as project partners. If a sister plant supplies assemblies, it can sit on the project as a partner in the same way. The assembly number is then a property on the task, and the bill of materials stays in Infor.

  • Supplier number
  • Contacts
  • Project assignment
  • Assembly number
BackHours

Planned hours and hours report

Infor fetches the planned hours per task and resource, plus target, actual and remaining hours per order or task. Your Infor partner assigns them to the project that carries the costs in Infor.

  • Planned hours per task
  • Planned hours per resource
  • Target
  • Actual
  • Remaining
BackKPIs

KPIs for group controlling

Per project, completion, traffic light, schedule adherence and phase come back, plus KPIs per company and per resource group and month with net capacity, planned hours and difference. Controlling uses them to compare plant utilisation in its own report.

  • Completion
  • Traffic light
  • Schedule adherence
  • Phase
  • Net capacity
  • Planned hours
  • Difference

Across plants

How several plants plan with Infor ERP and Linetrack

Design at headquarters, assembly at the subsidiary

A customer orders a press line. Mechanical design is done at the main plant, assembly and commissioning at the plant in the Czech Republic. In Linetrack both are in one project, and each team plans on its own resource groups.

Allocating by free capacity

A new order could be assembled in either of two plants. Management checks the report with net capacity and planned hours per resource group and month and gives the assembly to the plant that has room in the third quarter.

New fitters without double entry

Four fitters start on the first of the month. With the next sync they are in Linetrack with their personnel number and can be scheduled for the next commissioning, without anyone creating them a second time.

The hydraulic unit arrives later

Purchasing enters a later delivery date for the hydraulic unit in Infor. The interface moves the milestone “Goods receipt hydraulics” in Linetrack by its ERP ID, and the project manager sees which assembly tasks depend on it.

Month-end in controlling

At month-end Infor fetches the hours reports of all orders with target, actual and remaining hours. Controlling sees which project's remaining hours no longer fit the budget and talks to the project manager while there is still time to act.

A plant without absence reasons

The works council of one plant does not want reasons for sickness visible in planning. For that plant the route sends absences in the privacy-compliant variant, with the period only. Net capacity is still correct, and Linetrack shows a neutral “Absence”.

Process

How the connection to Infor ERP is built

  1. 1

    Clarify plants and data ownership

    With you and your Infor partner we decide which fields come from Infor LN or CloudSuite Industrial, which plants are connected, and which template, calendar and portfolio belong to which plant.

  2. 2

    Set up the calls

    The route runs through Infor ION or a middleware such as Power Automate, Make or n8n and calls https://app.linetrack.de/api/integrations/v1 with an API key that only grants the areas needed. The trigger is an event in Infor or a schedule.

  3. 3

    Switch on plant by plant

    We start with one plant and one running project. Once the sync is right there, the other sites follow. Every call is logged in Linetrack.

FAQ

Frequently asked questions

Any questions?

Book a call with our team.

Which Infor products can be connected?

Any Infor ERP from which data can be read and from which a REST API can be called, directly or through middleware. For machine and plant builders, Infor LN and Infor CloudSuite Industrial (SyteLine) are the main candidates.

Is there a Linetrack connector in the Infor ecosystem?

No. Linetrack is not an Infor partner product and has no connector of its own for Infor ION. The connection is a route against the documented Linetrack REST API. Which data your Infor system provides and who runs the route is something we are glad to clarify with your IT.

Can each plant have its own templates and calendars?

Yes. When creating a project, the interface passes template, calendar and portfolio. It reads which values exist in Linetrack from the Linetrack master data through the API and maps them to the plants in Infor.

Are bills of materials or routings taken over from Infor?

Bills of materials are not; Linetrack plans tasks and hours, not material. Effort from routings can be transferred as hours per task and resource once it is assigned to a task in Linetrack. An assembly number can come along as a property on the task.